Heck Of A Guy

A pastiche of posts, featuring song, dance, snappy chatter plus notes on prose, poesy, love, lust, life, and beyond

Heck Of A Guy random header image

Construction Delays

April 1st, 2008 at 11:06 am · DrHGuy · 1 Comment

Heck Of A Guy Site In Final Stages Of Update

Today has been spent in applying a major upgrade to the WordPress software that operates the Heck of a Guy blog.1 It looks as though the problems in the changeover were limited to two or three files that were corrupted when they were copied into the system (probably the result of my anemic bandwidth), code differences that caused tools I had used for extended periods without problems to cease playing well together, and some processes undergoing such improvement that this blog’s antiquated layout, hobbled by the 30 or 40 temporary fixes I’ve installed in the two years since the blog began, just couldn’t handle them.

It looks as though, however, the significant glitches have been de-glitched. There is a bit of cleanup and a few more items to check, but Heck of a Guy should be back in business tomorrow.


Footnotes

  1. The AlignMap, EnrichMap, and LeonardCohenSearch sites also underwent the same update; Heck of a Guy is, of course, the only one that suffered serious problems

Tags: HOAG Site

1 response so far ↓

  • 1 ben // Apr 1, 2008 at 12:54 pm

    does this mean the word definer is gonna work